We renovate tilt wall buildings in Texas and finish them for new tenants, from slab repair and new dock doors to offices, power and racking-ready slabs.
The last tenant's racking is still bolted to the floor, the lights are the wrong kind, the office is in the wrong corner and the dock doors do not match the trucks the new user brings. That is the normal state of a second-generation tilt wall building, and it is where a renovation contractor earns a living. The shell is strong and cheap to reuse. The interior is rarely what the next user needs.
We take existing tilt wall buildings and turn them into what the next tenant needs. That might mean cutting new openings, repairing a slab, adding office space and restrooms, upgrading power and lighting, or replacing the roof. The work is done on a landlord's or tenant's schedule, often with a lease commencement date waiting at the end.
Here is how we handle the survey, the scope and the order of work, and what drives the cost.
Why second-generation space keeps getting reused
Texas has a large inventory of tilt wall industrial buildings, and the demand for them continues because there is not always time to build new. Look at what employers occupy. In Lancaster, the top employers on the city's 2024 report included e-commerce and logistics operators with 350 to 450 employees each, and a Park 20/35 logistics business park is named in the same report. In San Marcos, an online retail fulfillment operation was the top employer in 2021 with about 5,000 employees. In Mesquite, a parcel carrier, a mall and a solar company each reported 1,000 or more employees.
Those users reuse and re-fit buildings every few years as their operations change. A fulfillment operator wants conveyors, a manufacturer wants power, a carrier wants dock capacity. Each re-fit leaves the shell in a different state, and we survey it with a fresh eye.
Surveying what is already there
We begin with a walk through the building with the landlord, the tenant and the architect, and then with a detailed survey of the slab, the panels, the roof and the mechanical and electrical systems. We check slab flatness and levelness for the new racking, and we look for cracks, curling at joints and spalls at dock aprons. We check the panel joints for sealant failure and the roof for ponding, and we count the dock doors and test the levelers.
The survey produces a punch list in priority order: life-safety items, items the lease requires, items the tenant needs on day one and items that can wait. That gives the landlord and the tenant a budget they can allocate. We use commissioning and closeout practices to document the as-found condition, so there is a record of what existed before the work began.
Racking drives more renovation decisions than owners expect. Tall storage puts concentrated point loads on the slab, and a floor that was fine for floor-stacked pallets can crack under rack legs if the slab is thin or the subgrade is soft. We check the slab thickness with cores where the tenant plans heavy storage, ask the rack supplier for the leg loads and spacing, and decide whether to add thickened pads under the legs. The fire protection design follows the storage height, so we confirm the sprinkler layout at the same time and avoid redoing the ceiling later.
Typical renovation scope
Typical items include new or modified dock doors and levelers, slab repair and joint filling, new office buildout with restrooms and HVAC, upgraded electrical service and lighting, new fire protection to suit the storage plan, roof repairs or replacement, exterior repainting and sealing, and parking and truck court repairs. Many of these overlap, so we sequence them to avoid tearing out new work. The slab is repaired before racking goes in, and the fire protection is adjusted before the ceiling is closed.
If the tenant needs a new opening, we use the methods described under openings and door cutouts in panels. If it needs a new slab section, we saw cut, remove and re-pour with dowels. The tilt wall floor slabs approach to subgrade and curing applies to the new section.
What we manage most closely
We manage concrete repair, slab work, panel patching, sealing and general carpentry for office framing. Specialty trades, such as electrical, mechanical, fire protection and roofing, work under our management. That arrangement gives us control of the scheduling and quality on the items that matter most to the lease date.
Tenant work often has to happen quietly. We work around operating hours, keep egress clear and test fire alarm and sprinkler shutdowns with the landlord. In occupied buildings we provide dust protection and daily cleanup. The tenant's insurance and the landlord's rules are followed to the letter.
What drives renovation cost
The biggest swing factor is condition. A building that was well maintained needs paint, sealant and some slab repair. A building with a failing roof, severe slab damage or deferred maintenance needs real money. Our survey puts numbers on those, so the landlord can decide between a full renovation and a lighter refresh. Tenant improvement allowances usually set the ceiling, and we design the scope to fit within them.
Power is another common driver. Modern fulfillment and manufacturing users often want much more electrical capacity than the building was built with, and utility upgrades take time. We raise the question early with the owner's utility provider. For smaller buildings, a retrofit may mean a tilt wall additions and expansions discussion rather than a renovation.
Where we do this work
Renovations are close to the user, so we work where the building is. In practice that means the large industrial markets in North Texas, Houston, San Antonio, Austin and the Rio Grande Valley, and anywhere else a user has found a building worth reusing. We ask for the address and the lease timeline at the first call.
Owners tend to be industrial developers and REITs preparing a building for lease, or tenants such as logistics and 3PL operators fitting out a new site. Both want a clear scope, an honest schedule and a final price before work begins.
Send us the lease and the address
Share the building address, the lease commencement date and the tenant requirements. We will survey the building, set a scope and give you a budget and schedule you can plan around.
Common Questions
Can you work while the building is occupied?
Yes, with a plan for access, dust control, noise and shutdowns. We coordinate with the tenant's operations and keep life-safety systems active.
Who pays for the work, the landlord or the tenant?
That is set in the lease. We price landlord work and tenant work separately and can track the allowance for the owner.
What is the first thing to check in an old tilt wall building?
The roof, the slab and the dock equipment, in that order. These three decide whether the building suits the tenant and what it will cost.
Can a tilt wall building take more power?
Usually the structure can; the question is utility capacity and the room for new gear. We coordinate with the provider early.
How long does a tenant finish take?
It depends on scope, but long-lead items like electrical gear and doors usually control the date. We start procurement first.